Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
Dwari Khola Small Hydropower Project, developed by Bhugol Energy Development Co. (BEDC) is located at Naumule in Dailekh District in the Mid-Western Development Region of Nepal. The headworks are 3 km upstream of the confluence of the Dwari Khola and Lohore Khola, with the powerhouse 300 meters downstream from the confluence.
Catchment Area | 19.10 km2 |
---|---|
Maximum Net Head | 418.96 m |
Average Annual Discharge | 1.58 m3/s |
Maximum Gross Head | 450.40 m |
Power House | Surface |
---|
Penstock -Diameter | 0.76 m |
---|---|
Tailrace Canal Length | 50 m |
Type | Horizontal Axis Pelton |
---|---|
Number of Units | 2 |
Rated Capacity | 2100 KW |
Rated Output | 2100 KW |
Rated Capacity | 22060 KVA |
---|---|
Type | Synchronous brushless 3 Phase |
Number of Units | 1 |
---|
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live