The Khani Khola Hydropower Station is a 2 MW run-of-river project located in the Lalitpur District of Bagmati Province, Nepal. Developed by Khani Khola Hydropower Company Ltd., originally an IPP and now a public limited company, the project utilizes the flow of the Khani Khola. It was commissioned on 9 Kartik 2073 BS (October 25, 2016 AD) and operates in cascade with the upstream Tungun–Thosne Hydropower Project (4.36 MW), using its tailwater for further generation. The combined output of the cascade system is approximately 32.27 GWh annually. The project is connected to the national grid via the Malta Substation (~1.5 km away), with road access via a 2.5 km Bhattedanda–Thosne route. The plant was financed through a public-private equity model, with IPOs launched in January and July 2016, involving promoter, community, and public shareholders. The company reported a net profit of NPR 15.9 million in Q1 of FY 2081/82. The generation license is valid until 2104‑11‑02 BS (~February 16, 2048 AD), and electricity is sold to the Nepal Electricity Authority under a Power Purchase Agreement.
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live