Gwh/yr

Energy Generation

1.475MW

Installed Capacity

About

Lower Selang Khola Hydroelectric Project (LSKHEP) uses water from Selang Khola , a tributary of Balephi khola. Sabha khola separates Golche VDC and Selang VDC. Golche VDC. Diversion project components of LSKHEP are located along the left bank of Selang Khola within Golche of Sindhupalchowk district of Bagmati zone in Central Development Region (CDR) of Nepal. The headworks site is located at about 200 m downstream from the confluence of Selang Khola and Kalayang balayang Khola at Pandhu of Golche ward no 9 and Selang VDC at the other side. The approach canal, headrace, and penstock alignment will run along the left bank of Selang Khola in Golche VDC. Water from trench intake is carried to gravel trap, 6 m long approach canal and then to desander cum forebay. 1504 m long penstock pipe will carry design discharge to powerhouse and finally water is released to Selang khola through 118 m long rectangular canal i.e. tailrace. The proposed powerhouse site is located at the left bank of Selang Khola near Dunde of Golche VDC, Ward No.9.

Salient Features

Data not found

check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live

Location