Located in the middle reach of Mai river in Ilam district in eastern part of Nepal, Mai Beni Hydropower Project is a runoff river type hydropower project with an installed capacity of 9.51 MW. The project is the pilot project of Urja Developers Pvt. Ltd., and has undergone construction works since May 2018. The components of the project lie between 490 m and 645 m above mean sea level, all of which are accessible through access roads constructed by the project itself. All the major components of the project are within 5 km distance from Mechi highway.
Design Discharge | 8.4m3/s |
---|---|
Maximum Net Head | 134.91 m |
Maximum Gross Head | 147.5 m |