Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
The 23.5 MW project is a simple run off river scheme with 5.5m high, 26m long diversion weir, side intake, surface de-silting basin and pipe line (water conveyance system) of 3860m length and 2.5m diameter, inclined steel surge tank, surface penstock, surface powerhouse and tailrace canal. Design discharge is 12.26m3/sec and head of the project is 229.30m. Power produced will be sold to Nepal Electricity Authority.
Catchment Area | 291 km 2 |
---|---|
Design Discharge | 12.26 m 3 /s |
Maximum Net Head | 217.87 m |
Maximum Gross Head | 229.30 m |
Penstock- Length | 397.00 m |
---|---|
Tailrace Canal Length | 65 m |
Type | Francis |
---|---|
Number of Units | 2 |
Rated Capacity | 12500 KW |
Rated Output | 23.5 MW (2 units) |
Number of Generators | 2 |
---|---|
Power Factor | 0.85 |
Type | 3 phase Synchronous |
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live