520.8 GWhGwh/yr

Energy Generation

86MW

Installed Capacity

Salient Features

Hydrology ( Intake )

Catchment Area 454.0 km 2
Design Discharge 17.05 m 3 /s
Maximum Net Head 600 m
Maximum Gross Head 613.2 m

Head Works (Intake)

Diversion Height 5m above natural bed
Diversion Length 6m

Waterways

Headrace Tunnel-Length 4600.0 m
Penstock- Length 1650 m
Penstock-Diameter 2.1m to 2.5 m
Tailrace Canal Length 150m

Powerhouse

Power House Surface
Design Head 55m X 22m X 16m

Turbine

Type Vertical axis Pelton turbine
Rated Output 3 X 29 MW

Generators

Rated Capacity 36 MVA
Type Synchronous 3 Phase

Transformers

Number of Units 10
check-mark

Application for Survey License

check-mark

Survey License Approved

check-mark

Application for Generation License

check-mark

Under Construction

check-mark

Live