The Proposed Super Kabeli Khola A Hydropower Project is a run-of- river type project with major components comprising of diversion weir, intake, gravel trap, approach culvert, settling basin, head race pipe, head race tunnel, surge pipe, steel penstock pipe, powerhouse and tailrace. The project consist of Headworks arrangement at Barule village. The proposed weir crest level is at an elevation 2252.00 meter above msl. The crest of the 24.50 m long diversion weir is about 2.0 m above the bed level of the river