Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
Super Mai A Hydropower Project in situated in Illam District, Mechi Zone of Eastern Development Region of Nepal. It is 550 km away from Kathmandu by road. The project utilizes water from the Kumbhakarna Range, which form the Mai river. The headwork is situated at Sulbung VDC, Illam. The powerhouse is located at Gangate Faat, Sumbek VDC, Illam.
Catchment Area | 129 km2 |
---|---|
Design Discharge | 6.4m3 /s |
Maximum Net Head | 186.025 m |
Maximum Gross Head | 199.3 m |
Penstock-Diameter | 1.8 m |
---|---|
Tailrace Canal Length | 54 m |
Type | Vertical axis Francis turbine |
---|---|
Rated Output | 3 X 3.5 MW |
Rated Capacity | 12 MVA |
---|---|
Type | Salient Pole, Synchronous |
Number of Units | 1 |
---|
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live