The UAHEP is a proposed 335 MW hydroelectric facility to be located on the Arun River in Sankhuasabha District of eastern Nepal. The project area is situated about 15 km south of the international border with Tibet and 220 km east of Kathmandu. The proposed dam site is located in the Chepuwa Village, in a narrow gorge about 350 m upstream of the Arun River’s confluence with the Chepuwa River. The proposed power plant site is located in the Hatiya Village 16 km downstream of the dam site, near the Arun River’s confluence with the Leksuwa River. The right bank of the Arun River at the proposed UAHEP site falls within the Makalu Barun Buffer Zone, which is adjacent to the Makalu Barun National Park. The proposed UAHEP dam site is therefore located at the edge of the Buffer Zone