Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live
Catchment Area | 191.30 km'? |
---|---|
Design Discharge | g.8o m3/s |
Maximum Net Head | 299.31 m |
Maximum Gross Head | 325.56 m |
Headrace Tunnel-Length | 2632 m |
---|---|
Penstock- Length | 3140 m |
Penstock-Diameter | 1.9 m |
Type | Horizontal Shaft Pelton Turbine |
---|---|
Rated Output | 2*12.5 MW |
Type | 3 phase synchronous |
---|
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live