6

Projects

Hydropower Projects on
Tamakoshi River

0.47MW

Installed capacity

Babiyodada Manthali Khola Micro Hydropower Project

Tamakoshi River
Lamabagar (Dolakha)
Application Date: 2018-09-17
Installed Capacity : 0.47 MW
Phase : Application for Survey License
View On Map

0.25MW

Installed capacity

Rawa Chyalabyala Fisur Khola Micro Hydroelectric Project

Tamakoshi River
Lamabagar (Dolakha)
Application Date: 2018-11-28
Installed Capacity : 0.25 MW
Phase : Application for Survey License
View On Map

87MW

Installed capacity

Tamakoshi V Hydropower Project

Tamakoshi River
Lamabagar,Orang,Bulung,Laduk,Gauri Sankar (Dolakha)
Issue Date: 2017-05-03
Installed Capacity : 87 MW
Phase : Under Construction
View On Map

22MW

Installed capacity

Lapche-Tamakoshi HEP

Tamakoshi River
Issue Date: 2018-02-25
Installed Capacity : 22 MW
Phase : Survey License Approved
View On Map

24.46MW

Installed capacity

Tamakoshi- 9 HEP

Tamakoshi River
Lamabagar (Dolakha)
Issue Date: 2018-06-11
Installed Capacity : 24.46 MW
Phase : Survey License Approved
View On Map

456 MWMW

Installed capacity

Upper Tamakoshi Hydropower Project

Tamakoshi River
Bulung,Gauri Sankar,Khare,Lamabagar,Sunakhani,Sundrawati (Dolakha)
Issue Date: 2010-12-03
Installed Capacity : 456 MW MW
Phase : Under Construction
View On Map
check-mark

Application for Survey License

2
check-mark

Survey License Approved

2
check-mark

Application for Generation License

0
check-mark

Under Construction

2
check-mark

Live

0

Location

  • Dolakha Ramechhap Sindhuli