Tatopani Hydropower Station is a small run-of-river hydropower project located in Myagdi District, Gandaki Province, Nepal. Commissioned on December 21, 1994 (6th Poush 2051 BS), the plant harnesses the flow of the Tatopani River through a gravity diversion dam. The project has an installed capacity of 2.0 MW and is owned and operated by the Nepal Electricity Authority (NEA). It contributes to Nepal’s grid with a generation license valid until 2101-11-30 BS. Although catchment area and detailed hydrological data at the intake and powerhouse are not publicly specified, the plant continues to provide clean and reliable electricity to the region. The facility is part of NEA’s network of run-of-river projects supporting local energy demands in western Nepal.