Projects

Hydropower Projects Constructed:
Nepal Electricity Authority

14MW

Installed capacity

Kulekhani 3 Hydropower Project

Kulekhani Khola
Bhaise (Makawanpur)
Issue Date: 2008-03-30
Installed Capacity : 14 MW
Phase : Under Construction
View On Map

42MW

Installed capacity

Upper Modi A Hydropower Project

Kulekhani Khola , Modi Khola
Lumle,Ghandruk (Kaski)
Issue Date: 2015-06-19
Installed Capacity : 42 MW
Phase : Under Construction
View On Map

14MW

Installed capacity

Upper Modi Hydropower Cascade Project

Kulekhani Khola , Modi Khola , Modi Khola
Dangsing,Ghandruk,Lumle (Kaski)
Issue Date: 2018-03-16
Installed Capacity : 14 MW
Phase : Under Construction
View On Map

40MW

Installed capacity

Rahughat Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola
Jhin (Myagdi)
Issue Date: 2011-07-19
Installed Capacity : 40 MW
Phase : Under Construction
View On Map

35MW

Installed capacity

Dudhkoshi Storage Hydroelectric Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River
Application Date: 2019-03-12
Installed Capacity : 35 MW
Phase : Application for Survey License
View On Map

2MW

Installed capacity

Tatopani Small Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola
Annapurna, Myagdi
Commercial Operation Date : 1988-04-13
Installed Capacity : 2 MW
Phase : Live
View On Map

32MW

Installed capacity

Kulekhani II Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola
Bhainse, Makawanpur
Commercial Operation Date : 1986-11-01
Installed Capacity : 32 MW
Phase : Live
View On Map

1.024MW

Installed capacity

Tinau Hydropower

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi
Dovan, Palpa
Commercial Operation Date : 1981-04-13
Installed Capacity : 1.024 MW
Phase : Live
View On Map

1.5MW

Installed capacity

Seti Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola
Nadipur, Pokhara
Commercial Operation Date : 1985-11-01
Installed Capacity : 1.5 MW
Phase : Live
View On Map

69MW

Installed capacity

Marsyangdi Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River
Tanahu
Commercial Operation Date : 1989-11-05
Installed Capacity : 69 MW
Phase : Live
View On Map

24MW

Installed capacity

Trishuli Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River
Trishuli, Nuwakot
Commercial Operation Date : 1967-04-14
Installed Capacity : 24 MW
Phase : Live
View On Map

15MW

Installed capacity

Gandak Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi
Surajpura, Nawalparasi
Commercial Operation Date : 1979-04-01
Installed Capacity : 15 MW
Phase : Live
View On Map

14.8MW

Installed capacity

Modikhola Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola
Dimuwa, Parbat
Commercial Operation Date : 2000-12-01
Installed Capacity : 14.8 MW
Phase : Live
View On Map

144MW

Installed capacity

Kaligandaki A Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River
Beltari, Syangja
Commercial Operation Date : 2002-07-29
Installed Capacity : 144 MW
Phase : Live
View On Map

70MW

Installed capacity

Middle Marsyangdi Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River
Siundibar, Lamjung
Commercial Operation Date : 2008-11-01
Installed Capacity : 70 MW
Phase : Live
View On Map

200MW

Installed capacity

Tamor Storage

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River
Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E
Issue Date: 2013-07-31
Installed Capacity : 200 MW
Phase : Survey License Approved
View On Map

200MW

Installed capacity

Tamor Storage

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River
Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E
Issue Date: 2013-07-31
Installed Capacity : 200 MW
Phase : Survey License Approved
View On Map

200MW

Installed capacity

Tamor Storage

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River
Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E
Issue Date: 2013-07-31
Installed Capacity : 200 MW
Phase : Survey License Approved
View On Map

200MW

Installed capacity

Tamor Storage

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River
Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E
Issue Date: 2013-07-31
Installed Capacity : 200 MW
Phase : Survey License Approved
View On Map

200MW

Installed capacity

Tamor Storage

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River
Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E
Issue Date: 2013-07-31
Installed Capacity : 200 MW
Phase : Survey License Approved
View On Map

200MW

Installed capacity

Tamor Storage

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River
Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,E
Issue Date: 2013-07-31
Installed Capacity : 200 MW
Phase : Survey License Approved
View On Map

828MW

Installed capacity

Uttarganga Storage Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi
Bowang,Boharagaun,Nisi,Adhikarichaur (Baglung)
Application Date: 2019-07-02
Installed Capacity : 828 MW
Phase : Application for Generation License
View On Map

1.0MW

Installed capacity

Phewa Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola
Pokhara, Kaski
Commercial Operation Date : 1969-04-13
Installed Capacity : 1.0 MW
Phase : Live
View On Map

2.4MW

Installed capacity

Panauti Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola
Panauti, Khopasi
Commercial Operation Date : 1965-04-13
Installed Capacity : 2.4 MW
Phase : Live
View On Map

60MW

Installed capacity

Upper Trishuli 3A Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River
Dandagoun,Laharepouwa,Thulogoun,Ramche (Rasuwa)
Issue Date: 2011-02-27
Installed Capacity : 60 MW
Phase : Live
View On Map

35MW

Installed capacity

Dudhkoshi Storage HEP

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River
Dumekoldada,Kharpa,Kuvinde,Lamidada,Dharapani,Hauchour (Khotang) Kuimir,Pokhare,Serna,Mamkha (Okhaldhunga) Panchan,Jubu (Solukhumbu)
Issue Date: 2018-08-23
Installed Capacity : 35 MW
Phase : Survey License Approved
View On Map

37MW

Installed capacity

Upper Trishuli 3B Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River , Trishuli River
Manakamana (Nuwakot)
Commercial Operation Date : 2018-11-01
Installed Capacity : 37 MW
Phase : Under Construction
View On Map

60MW

Installed capacity

Kulekhani 1 Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River , Trishuli River , Kulekhani Khola
Dhorsing, Makwanpur
Commercial Operation Date : 1982-05-04
Installed Capacity : 60 MW
Phase : Live
View On Map

6.2MW

Installed capacity

Puwa Khola Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River , Trishuli River , Kulekhani Khola , Puwa Khola
Illam
Commercial Operation Date : 2004-04-04
Installed Capacity : 6.2 MW
Phase : Live
View On Map

30MW

Installed capacity

Chameliya Khola Hydropower Project

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River , Trishuli River , Kulekhani Khola , Puwa Khola , Chamaliya Nadi
Shikhar, Darchula
Commercial Operation Date : 2018-02-10
Installed Capacity : 30 MW
Phase : Live
View On Map

14.1MW

Installed capacity

Devighat Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River , Trishuli River , Kulekhani Khola , Puwa Khola , Chamaliya Nadi , Trishuli River
Battar, Nuwakot
Commercial Operation Date : 1984-12-01
Installed Capacity : 14.1 MW
Phase : Live
View On Map

10.05MW

Installed capacity

Sunkoshi Hydropower Station

Kulekhani Khola , Modi Khola , Modi Khola , Raughat Khola , Dudhkoshi River , Tatopani Khola , Kulekhani Khola , Tinau Nadi , Seti Khola , Marsyangdi River , Trishuli River , Narayani (Sapta Gandaki) Nadi , Modi Khola , Kali Gandaki River , Marsyangdi River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Tamor River , Uttar Ganga Nadi , Seti Khola , Roshi Khola , Trishuli River , Dudhkoshi River , Trishuli River , Kulekhani Khola , Puwa Khola , Chamaliya Nadi , Trishuli River , Sunkoshi Nadi
Sindhupalchok
Commercial Operation Date : 1972-04-13
Installed Capacity : 10.05 MW
Phase : Live
View On Map

180MW

Installed capacity

Adhikhola Storage HEP

Nepal Electricity Authority, Central Office Durbarmarg, Kathmandu 4153054, 4153055, 4153007
Installed Capacity : 180 MW
Phase : Application for Generation License
View On Map
check-mark

Application for Survey License

1
check-mark

Survey License Approved

7
check-mark

Application for Generation License

2
check-mark

Under Construction

5
check-mark

Live

18