Hydropower Projects

mai khola

Middle Likhu Small Hydroelectric Project

Rawadolu (Okhaldhunga) Goli (Solukhumbu)

  • Application Date: 2019-02-22
  • Installed Capacity : 8.6MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Dodhare Khola Hydroelectric Project

  • Application Date: 2019-03-05
  • Installed Capacity : 2.5MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Upper Bhairabkunda Hydroelectric Project

  • Application Date: 2019-03-17
  • Installed Capacity : 3.7MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Upper Arun Hydroelectric Project

Pathibhara,Pawakhola (Sankhuwasabha)

The UAHEP is a proposed 335 MW hydroelectric facility to be located on the Arun River in Sankhuasabha District of eastern Nepal. The project area is situated about 15 km south of the international border with Tibet and 220 km east of Kathmandu. The proposed dam site is located in the Chepuwa Village, in a narrow gorge about 350 m upstream of the Arun River’s confluence with the Chepuwa River. The proposed power plant site is located in the Hatiya Village 16 km downstream of the dam site, near the Arun River’s confluence with the Leksuwa River. The right bank of the Arun River at the proposed UAHEP site falls within the Makalu Barun Buffer Zone, which is adjacent to the Makalu Barun National Park. The proposed UAHEP dam site is therefore located at the edge of the Buffer Zone
  • Application Date: 2017-04-07
  • Installed Capacity : 335MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Budhigandaki Ka Hydroelectric Project

Gumda,Kerauja,Uiya (Gorkha)

  • Application Date: 2018-03-27
  • Installed Capacity : 105MW
  • Phase : Application for Generation License
  • Type : Run-of-River
mai khola

Budhigandaki Ka Hydropower Project

Uiya (Gorkha)

  • Application Date: 2018-03-28
  • Installed Capacity : 130MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Upper Mugu Karnali Hydropower Project

Mangri,Pulu,Rowa (Mugu)

  • Application Date: 2018-11-01
  • Installed Capacity : 306MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Madi Storage Hydroelectric Project

Kareti,Liwang (Rolpa)

  • Application Date: 2019-02-10
  • Installed Capacity : 156MW
  • Phase : Application for Survey License
  • Type : Storage
mai khola

Naumure Storage Hydroelectric Project

Juluke (Arghakhanchi)

  • Application Date: 2019-03-11
  • Phase : Application for Survey License
  • Type : Storage
mai khola

Lower Arun Hydroelectric Project

Diding,Sitalpati (Sankhuwasabha)

  • Application Date: 2019-03-13
  • Installed Capacity : 679MW
  • Phase : Application for Survey License
  • Type : Run-of-River
mai khola

Jurimba Khola Small Hydropower Project

Listi,Tatopani (Sindhupalchok)

  • Issue Date: 2014-08-31
  • Installed Capacity : 7.63MW
  • Phase : Under Construction
mai khola

Jogmai Cascade

Namsaling (Ilam)

  • Issue Date: 2014-10-08
  • Installed Capacity : 6MW
  • Phase : Under Construction