Hydropower Projects

mai khola

Midim 1 HEP

  • Issue Date: 2017-05-24
  • Installed Capacity : 13.424MW
  • Phase : Under Construction
mai khola

Upper Seti-1 HEP

Purachaur (Kaski)

  • Issue Date: 2017-05-24
  • Installed Capacity : 13MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Malta Bagmati Small Hydro Power Project

Malta,Pyutar (Lalitpur)

  • Issue Date: 2017-06-04
  • Installed Capacity : 8.85MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Arun Khola 2 HEP

Humsekot,Rakachuli (Nawalparasi)

  • Issue Date: 2017-06-07
  • Installed Capacity : 2MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Mid Rawa Khola HEP

Baksila,Rakha Bangdel (Khotang)

  • Issue Date: 2017-06-09
  • Installed Capacity : 2.5MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Lower Iguwa Khola Hydro-Electric Project

Sawalakhu (Taplejung)

  • Issue Date: 2017-06-09
  • Installed Capacity : 6.9MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Super Kabeli Khola A

Yamfudin (Taplejung)

The Proposed Super Kabeli Khola A Hydropower Project is a run-of- river type project with major components comprising of diversion weir, intake, gravel trap, approach culvert, settling basin, head race pipe, head race tunnel, surge pipe, steel penstock pipe, powerhouse and tailrace. The project consist of Headworks arrangement at Barule village. The proposed weir crest level is at an elevation 2252.00 meter above msl. The crest of the 24.50 m long diversion weir is about 2.0 m above the bed level of the river
  • Commercial Operation Date : 2023-04-14
  • Installed Capacity : 13.5MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Khimti Ghwang Khola Small HPP

Syama (Dolakha)

  • Issue Date: 2017-06-21
  • Installed Capacity : 9.8MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

MIddle Ingwa Khola Hydropower Project

Chyangthapu,Falaicha (Panchthar) Ankhop (Taplejung)

  • Issue Date: 2017-07-06
  • Installed Capacity : 15MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Mid Solu Khola Hydropower Project

Gora Khami,Salleri (Solukhumbu)

  • Issue Date: 2017-07-21
  • Installed Capacity : 9.5MW
  • Phase : Under Construction
  • Type : Run-of-the-river
mai khola

Jeuli-Gad Cascade Hydroelectric Project

Chainpur,Rithapata (Bajhang)

  • Issue Date: 2017-07-30
  • Installed Capacity : 2MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river
mai khola

Pikhuwa Pashupati HEP

  • Issue Date: 2017-07-30
  • Installed Capacity : 4.100MW
  • Phase : Survey License Approved
  • Type : Run-of-the-river