Hydropower Projects

mai khola

Bijaypur Khola-2 Hydropower Project

Lekhnath (Kaski)

  • Issue Date: 2016-08-09
  • Installed Capacity : 4.5MW
  • Phase : Under Construction
mai khola

Kali Gandaki-Kowan Hydropower Project

Kunjo,Kowang,Lete,Tukuche (Mustang)

  • Issue Date: 2016-08-15
  • Installed Capacity : 400MW
  • Phase : Issued Generation License
mai khola

Upper Khorunga Hydropower Project

Morahang,Shree Jung,Oyabjung,Pouthak (Terhathum)

  • Issue Date: 2016-08-24
  • Installed Capacity : 7.5MW
  • Phase : Live
mai khola

Upper Solu Khola Hydropower Project

Beni,Salleri (Solukhumbu)

  • Issue Date: 2016-09-01
  • Installed Capacity : 18MW
  • Phase : Under Construction
mai khola

Makari gad Hydropower Project

Guljar,Khandeswori (Darchula)

  • Issue Date: 2016-09-12
  • Installed Capacity : 10MW
  • Phase : Under Construction
mai khola

Yambaling Khola Hydropower Project

Gumba,Golche (Sindhupalchok)

  • Issue Date: 2016-09-25
  • Installed Capacity : 7.271MW
  • Phase : Under Construction
mai khola

Sano Milti Khola Small Hydropower Project

Dandakharka,Melung (Dolakha) Phulasi (Ramechhap)

  • Issue Date: 2016-09-25
  • Installed Capacity : 3MW
  • Phase : Under Construction
mai khola

Madi-Bhorletar Hydropower Project

Hansapur,Thumki,Siddha (Kaski)

  • Issue Date: 2016-09-16
  • Installed Capacity : 10MW
  • Phase : Under Construction
mai khola

Trishuli Galchhi Hydropower Project

Duipipal,Ratmate (Nuwakot)

shuli Galchhi Hydroelectric Project (75 MW) is located in Nuwakot and Dhading district of Nepal on Trishuli river, a major tributary of Sapta Gandaki river. The Company has obtained the Survey Licence of the Project on 24th Asoj, 2067 B.S ( 10th Oct, 2010 A.D) from Ministry of Energy through Department of Electricity Development and completed the detailed Survey of the Project. The Company has entered a Power Purchase Agreement PPA with Nepal Electricity Authority on 20th Jestha, 2073 B.S. (2nd June, 2016 A.D). The Company has obtained the Generation License on 10th Kartik, 2073 B.S. (26th Oct, 2016 A.D) The Project is a Run-Of-River (ROR) type hydroelectric project. There is a provision of construction 24.5m high dam. There will be 8 radial gates of 12m high which makes a barrage in the Trishuli river. The ground head difference from the intake to the power house is found to be 58.5 meters. The net head varies from 49.82 m to 60.29 m in different months upon the discharge available in the river. The design discharge at Q40 is estimated to be 176m3/s. The installed capacity of the project is 75MW and contract energy is 430 GWh.
  • Issue Date: 2016-10-17
  • Installed Capacity : 75MW
  • Phase : Issued Generation License
  • Type : Run of River
mai khola

Rahughat Mangale Hydropower Project

Pakhapani,Chimkhola,Kuinemangale (Myagdi)

  • Issue Date: 2016-11-14
  • Installed Capacity : 37MW
  • Phase : Under Construction
mai khola

Upper Nyasim Khola Hydropower Project

Gumba (Sindhupalchok)

  • Issue Date: 2016-11-22
  • Installed Capacity : 43MW
  • Phase : Under Construction
mai khola

Khatyat Khola Small Hydropower Project

Sukhadhik (Mugu)

  • Issue Date: 2016-11-24
  • Installed Capacity : 0.5MW
  • Phase : Under Construction