Hydropower Projects

mai khola

Nilgiri Khola Hydropower Project

Narchyang (Myagdi)

  • Issue Date: 2017-08-15
  • Installed Capacity : 38MW
  • Phase : Under Construction
mai khola

Buku-Kapati Hydropower Project

Bhussinga,Rawadolu (Okhaldhunga) Goli (Solukhumbu)

  • Issue Date: 2017-08-24
  • Installed Capacity : 5MW
  • Phase : Under Construction
mai khola

Super Nyadi Hydropower Project

Bahundada,Bhulbhule (Lamjung)

  • Issue Date: 2017-08-30
  • Installed Capacity : 40.27MW
  • Phase : Under Construction
mai khola

Tinekhu Khola Small Hydropower Project

Jhyaku,Suriti (Dolakha)w

  • Issue Date: 2017-09-11
  • Installed Capacity : 0.99MW
  • Phase : Under Construction
mai khola

Seti Khola Hydropower Project

Shivalaya (Parbat)

  • Issue Date: 2017-09-11
  • Installed Capacity : 3.5MW
  • Phase : Under Construction
mai khola

Marsyangdi Besi Hydropower Project

Besisahar,Chandisthan,Bhulbhule,Gaunsahar,Bajhakhet,Hiletaxar (Lamjung)

  • Issue Date: 2017-09-17
  • Installed Capacity : 50MW
  • Phase : Under Construction
mai khola

Padam Khola Small Hydropower Project

Kalika (Dailekh)

  • Issue Date: 2017-10-15
  • Installed Capacity : 4.8MW
  • Phase : Live
mai khola

Lower Selang Khola Hydropower Project

Selang (Sindhupalchok)

Lower Selang Khola Hydroelectric Project (LSKHEP) uses water from Selang Khola , a tributary of Balephi khola. Sabha khola separates Golche VDC and Selang VDC. Golche VDC. Diversion project components of LSKHEP are located along the left bank of Selang Khola within Golche of Sindhupalchowk district of Bagmati zone in Central Development Region (CDR) of Nepal. The headworks site is located at about 200 m downstream from the confluence of Selang Khola and Kalayang balayang Khola at Pandhu of Golche ward no 9 and Selang VDC at the other side. The approach canal, headrace, and penstock alignment will run along the left bank of Selang Khola in Golche VDC. Water from trench intake is carried to gravel trap, 6 m long approach canal and then to desander cum forebay. 1504 m long penstock pipe will carry design discharge to powerhouse and finally water is released to Selang khola through 118 m long rectangular canal i.e. tailrace. The proposed powerhouse site is located at the left bank of Selang Khola near Dunde of Golche VDC, Ward No.9.
  • Issue Date: 2017-10-17
  • Installed Capacity : 1.475MW
  • Phase : Issued Generation License
mai khola

Upper Trishuli-1 Hydropower Project

Dhunche,Haku (Rasuwa)

Upper Trishuli-1 Hydroelectric Project is a ROR scheme in Trishuli River with 216 MW installed capacity. The total annual gross energy production of UT-1 is 1533.06 GWh. The project consists of a 29.5m high Dam, Underground Desander, a 9.8 km long Headrace Tunnel (HRT), Surge Tank and an Underground Power House as the main structures.
  • Issue Date: 2017-11-09
  • Installed Capacity : 216MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Istul Khola Hydropower Project

Aarupokhari (Gorkha)

  • Issue Date: 2017-11-30
  • Installed Capacity : 1.506MW
  • Phase : Under Construction
mai khola

Sapsup Khola Small Hydro Electric Project

Batase,Chhorambu,Rajapani (Khotang)

  • Issue Date: 2017-12-15
  • Installed Capacity : 7.151MW
  • Phase : Under Construction
mai khola

Lapche Khola Hydropower Project

Lamabagar (Dolakha)

  • Issue Date: 2017-12-17
  • Installed Capacity : 160MW
  • Phase : Under Construction