Hydropower Projects

mai khola

Upper Naugad Hydropower Project

Dhuligada,Sikhar (Darchula)

Upper Naugarh Gad Small Hydroelectric Project is a Run-Off-River type project which is developed by Api Power Company Limited. The project is located at 5km upstream of Naugarh Gad Hydroelectric Project (8.5MW) Intake which had been successfully constructed and operated by the same Company. The Project is located in Dhuligada and Shikhar VDC's of Darchula district in the Far Western Development Region of Nepal. Geographically, the site is located between Latitude 29044'18''N to 29043'25''N and Longitude 80039'48''E to 80036'26''E. The Headworks and the Powerhouse are located at an elevation of 1040.20m and 877.0m from mean sea level. The Project has installed capacity of 8MW with 163.44m of gross head. The Project is accessible from Gokuleshwor to Headworks area as there is existing access road.
  • Commercial Operation Date : 2019-10-30
  • Installed Capacity : 8 MWMW
  • Phase : Live
  • Type : Run of River
mai khola

Ruru Banchu Khola- 2 Hydropower Project

Gela,Chilkhaya (Kalikot)

  • Issue Date: 2017-01-03
  • Installed Capacity : 12MW
  • Phase : Under Construction
mai khola

Khimti II Hydropower Project

Chyama (Dolakha) Betali,Rasanalu (Ramechhap)

Khimti II Hydro-electric Project (48.8 MW) developing by Peoples Energy Limited is in the border of Ramechhap and Dolakha districts State No - 3 of Nepal. The headworks site is located near Rasnalu VDC of Ramechhap district and the powerhouse site is located at Simlep, Hawa VDC of Dolakha. Geographically, the project area is located in between latitudes 27 ̊33’07”-27 ̊35’13” and longitudes 86 ̊09’26”-86 ̊14’18”.The project is accessible from Kathmandu by 198km long road via Jiri or 145km long road via Khurkot-Manthali on BP highway.
  • Issue Date: 2017-01-06
  • Installed Capacity : 48.8MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Sisa Khola A Hydropower Project

Gora Khami,Kerung,Garma (Solukhumbu)

  • Issue Date: 2017-01-06
  • Installed Capacity : 2.8MW
  • Phase : Under Construction
mai khola

Upper Mardi Hydropower Project

Lwangghale (Kaski)

  • Issue Date: 2017-01-27
  • Installed Capacity : 7MW
  • Phase : Live
mai khola

Upper Lapche Khola Hydropower Power Project

Lamabagar (Dolakha)

  • Issue Date: 2017-02-03
  • Installed Capacity : 52MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Daram Khola Hydroelectric Project

Malm,Righa,Kandebas (Baglung) Arlangkot (Gulmi)

  • Issue Date: 2017-02-05
  • Installed Capacity : 7.3MW
  • Phase : Under Construction
mai khola

Ankhu Khola Hydropower Project

Darkha,Gumdi,Jharlang,Ree (Dhading)

  • Issue Date: 2017-02-09
  • Installed Capacity : 42.9MW
  • Phase : Under Construction
mai khola

Upper Chirkuwa Khola Hydropower Project

Nepaledada,Mulpani,Khartimchcha (Bhojpur)

  • Issue Date: 2017-02-22
  • Installed Capacity : 4.7MW
  • Phase : Under Construction
mai khola

Rawa Khola Hydropower Project

Sungdel,Diplung (Khotang)

  • Issue Date: 2017-03-09
  • Installed Capacity : 3MW
  • Phase : Live
mai khola

Sabha Khola-B Hydropower Project

Sabha Pokhari (Sankhuwasabha)

  • Issue Date: 2017-03-13
  • Installed Capacity : 15.1MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Middle Sunkoshi Hydropower Project

Choukati (Sindhupalchok)

  • Issue Date: 2017-03-26
  • Installed Capacity : 3.4MW
  • Phase : Issued Generation License