mai khola

Irkhuwa Khola-B Hydropower Project

Kudak Kaule,Chaukidada,Nepaledada (Bhojpur)

  • Issue Date: 2018-02-15
  • Installed Capacity : 15.524MW
  • Phase : Under Construction
mai khola

Rasuwa Bhotekoshi Hydropower Project

Thuman,Briddhim,Goljung (Rasuwa)

  • Commercial Operation Date : 2022-06-01
  • Installed Capacity : 120 MWMW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Super Mai-A Hydropower Project

Sumbek,Sulubung,Pyang (Ilam)

Super Mai A Hydropower Project in situated in Illam District, Mechi Zone of Eastern Development Region of Nepal. It is 550 km away from Kathmandu by road. The project utilizes water from the Kumbhakarna Range, which form the Mai river. The headwork is situated at Sulbung VDC, Illam. The powerhouse is located at Gangate Faat, Sumbek VDC, Illam.
  • Issue Date: 2018-03-02
  • Installed Capacity : 9.6MW
  • Phase : Live
  • Type : Run of River
mai khola

Upper Gaddi Gad Hydropower Project

Gaihragau,Kadamadaun,Sanagau (Doti)

  • Issue Date: 2018-03-14
  • Installed Capacity : 1.55MW
  • Phase : Under Construction
mai khola

Upper Modi Hydropower Cascade Project

Dangsing,Ghandruk,Lumle (Kaski)

  • Issue Date: 2018-03-16
  • Installed Capacity : 14MW
  • Phase : Under Construction
  • Type : Cascade,Run-of-River
mai khola

Gohare (Ichowk) Small Hydropower Project

Ichok (Sindhupalchok)

  • Issue Date: 2018-03-22
  • Installed Capacity : 0.95MW
  • Phase : Under Construction
mai khola

Taman Khola Hydropower Project

Burtiwang (Baglung)

  • Issue Date: 2018-04-08
  • Installed Capacity : 4.85MW
  • Phase : Under Construction
mai khola

Mai Beni Hydropower Project

Namsaling,Soyang,Goduk (Ilam)

Located in the middle reach of Mai river in Ilam district in eastern part of Nepal, Mai Beni Hydropower Project is a runoff river type hydropower project with an installed capacity of 9.51 MW. The project is the pilot project of Urja Developers Pvt. Ltd., and has undergone construction works since May 2018. The components of the project lie between 490 m and 645 m above mean sea level, all of which are accessible through access roads constructed by the project itself. All the major components of the project are within 5 km distance from Mechi highway.
  • Issue Date: 2018-04-19
  • Installed Capacity : 9.51MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Simrutu Khola Hydropower Project

Rugha (Rukum)

  • Issue Date: 2018-04-20
  • Installed Capacity : 0.2MW
  • Phase : Under Construction
mai khola

Arun 3 Hydropower Project

Diding,Num,Makalu,Matsya Pokhari,Mangtewa,Pathibhara (Sankhuwasabha)

  • Issue Date: 2018-05-03
  • Installed Capacity : 900MW
  • Phase : Issued Generation License
mai khola

Middle Daram Khola-A Hydropower Project

Heel,Argal,Amarbhumi (Baglung)

  • Issue Date: 2018-05-23
  • Installed Capacity : 3MW
  • Phase : Under Construction
mai khola

Middle Daram Khola-B Hydropower Project

Amarbhumi,Harichaur,Heel (Baglung)

  • Issue Date: 2018-05-23
  • Installed Capacity : 4.5MW
  • Phase : Under Construction